Wisconsin Brewing Co Oconomowoc Wisconsin

5BBL ProBrew Brewhouse placement in a 2 vessel configuration with the addition of a cereal cooker(hot liquor tank and cold liquor not shown)

Placed and prepped cellar tanks with a PPR glycol header

5 Cities Brewing Bettendorf Iowa

A close-up perspective between 90BBL fermentation vessels equipped with PEX glycol drops

Complete Alpha 30BBL System install with steam and condensate, grain handling flex auger run to grist case as well 2 chain disk units between silos to mill room, PPR glycol piping, and finally on site sanitary piping.

Duesterbeck’s Brewing Co Elkhorn Wisconsin

Complete 20BBL 4 Vessel ABE Brewhouse in the process of being install and fitted with steam, sanitary piping additions, glycol for the cold liquor tank and a flex auger to feed the grist case

Complete Balanced 3” PPR glycol loop with flexible hose connections

Phantom Farms Brewing Cumberland Rhode Island

A split level cellar feed by a balanced 2” PPR glycol loop with PEX tank connections

10BBL 3 vessel ProBrew brewhouse awaiting a grist case to be mounted above the mash tun

Cocoon Brewing De Pere Wisconsin

Placed and being plumbed cellar tank system feed by a balanced 2” PPR glycol loop

Assembled 10BBL2 vessel ABS brewhouse awaiting final steam and grain connections